Experience

Work & Experience

A combination of broadcast system integration and live production experience, built over 15+ years across both worlds.

Full-Time

Broadcast Systems Integration Experience

Full Broadcast Facility Upgrade: Regional News Station

Overview

Modernization of a legacy news broadcast facility to improve reliability and workflow efficiency.

Challenge

Aging infrastructure with limited flexibility and the need to upgrade without interrupting daily operations.

Approach

Designed a scalable system architecture and coordinated phased implementation.

Outcome

Improved reliability, streamlined workflows, and future-ready infrastructure.

Role

Project Manager overseeing design coordination, budgeting, vendor management, and execution.

LED Processing Upgrade: Major Arena Venue

Overview

Upgrade of LED processing systems to support modern content workflows.

Challenge

Transitioning systems in a high-traffic venue with minimal downtime.

Approach

Implemented a modern processing platform and integrated with existing systems.

Outcome

Improved performance, flexibility, and operator control for daily and event use.

Role

Supported design, integration planning, and commissioning.

PMT Independent

Live Production & Broadcast Roles

National Conference Production: Temporary Control Room Build

Overview

Built a fully functional control room inside a non-traditional space for a national conference.

Challenge

Non-standard environment with no purpose-built infrastructure for production.

Approach

Adapted the available space and built purpose-fit workflows under time pressure.

Outcome

Reliable execution across all sessions despite significant space limitations.

Real Moment

We had to take a standard church cry room and turn it into a fully operational control room.

Conference Production: Overnight Load-In

Overview

Large-scale event requiring full system readiness within 24 hours of arrival.

Challenge

Hard deadline with no room for delay. The show started whether ready or not.

Approach

Coordinated team deployment, system build, and testing through the night.

Outcome

Successful deployment and smooth show execution under significant pressure.

Real Moment

Overnight load-in with a hard deadline. Everything had to be show-ready by 5:00 PM.

Touring Projectionist: National Tour

Overview

Managed video playback systems across multiple venues on a national touring production.

Challenge

Every venue presented a new environment with different constraints and logistics.

Approach

Built adaptable workflows that could flex to each location without sacrificing execution quality.

Outcome

Consistent, reliable execution night after night across changing environments.

Real Moment

Every night was a new environment. Once the show started, everything had to work.